Sport

Complexe Sportif de Blocry à Louvain-La-Neuve - étude et suivi de la rénovation des vestiaires et des installations techniques HVAC du complexe

Louvain-La-Neuve / 2012

The renovation work consisted of:

  • Replacement of boilers: use of a modulating condensing gas boiler and soon cogeneration (in 2013),
  • Replacement of the ECS production and distribution system (legionellosis prevention),
  • Replacement of air handling units and placement of a dual flow VMC with heat recovery. Ventilation and heating provided in the rooms via micro-perforated ducts with a high induction rate,
  • Installation of energy accounting and centralized technical management allowing optimization of regulation: Heating and lighting are computerized in the rooms and the changing rooms, so that you can switch on according to the Reservation schedule,
  • Renovations of 25 groups of 2 changing rooms: efficient lighting, sensor cell on water taps to limit wastage,
  • Construction of a 100m3³ rainwater cistern to supply toilets and service taps,
  • Estimated fuel savings in studies: 840.000 kWh/year (or 66.000 €/year),
  • Estimated electricity savings in studies: 116.970 kWh/year (or 22.000 €/year).