Pools
Renovation of the "Triton" swimming pool in Evere
Evere / 2013
Renovation of the tanks and a part (solarium side) of the outdoor carpentry of the pool, technical equipment for water treatment.
The work performed was as follows:
- Construction and repair of concrete,
- Replacement of beach floor tiles,
- Laying a coating in the two tanks of the pool,
- Appropriation of hydraulic water treatment systems of the pool water up to 50 cm outside the tanks,
- All the accessories and the work of completion peripheral to the basins,
- Outdoor carpentry work,
- Replacement of the sliding outer frames of the pool (only the lower part),
- Replacement of a cafeteria frame and door (solarium side),
Technical equipment for water treatment:
- Installation of a chloramine reduction system by UV treatment of the large basin,
- adaptation of exchangers,
- piping,
- Circulation pump.