Pools
Renovation of the swimming pool of Soignies
Soignies / 2015
The Phase 3 project, subsidized by the Region (Subsidies Infra sports), lasted a little over six months.
at the renovation level, the whole ground floor was concerned (reception area, collective and individual changing rooms, sanitary facilities and showers as well as rooms reserved for staff were part of the program of work.
The aim was to obtain an easy welcome from the entrance, better accessibility and specific facilities for people with reduced mobility.
A series of actions such as the low-energy implementation for the reconditioning of the ground floor and the ventilation of the first floor will make it possible to save energy.